Checkbox input: Select 23-2479-WF-(A)001-T02 Existing Cluster Plan Phase A.pdf for download.
Existing Block/Site Plan
16/03/2026
Existing Cluster Plan, Three Oaks Lodges 1-7, Phase A
(1305kb)
23-2479-WF-(A)001 - T02
Checkbox input: Select 23-2479-WF-(B)001-T02 Existing Cluster Plan Phase B.pdf for download.
Existing Block/Site Plan
16/03/2026
Existing Cluster Plan, Three Oaks Lodges 8-19, Phase B
(1829kb)
23-2479-WF-(B)001 - T02
Checkbox input: Select 23-2479-WF-(C)001-T02 Existing Cluster Plan Phase C.pdf for download.
Existing Block/Site Plan
16/03/2026
Existing Cluster Plan, Three Oaks Lodges 20-30, Phase C
(1935kb)
23-2479-WF-(C)001 - T02
Checkbox input: Select 23-2479-WF-(D)001-T02 Existing Cluster Plan Phase D.pdf for download.
Existing Block/Site Plan
16/03/2026
Existing Cluster Plan, Three Oaks Lodges 31-40, Phase D
(3638kb)
23-2479-WF-(D)001 - T02
Checkbox input: Select 23-2479-WF-(E)001-T02 Existing Cluster Plan Phase E.pdf for download.
Existing Block/Site Plan
16/03/2026
Existing Cluster Plan, Beechwood Lodges 64-72, Phase E
(2088kb)
23-2479-WF-(E)001 - T02
Checkbox input: Select 23-2479-WF-(F)001-T02 Existing Cluster Plan Phase F.pdf for download.
Existing Block/Site Plan
16/03/2026
Existing Cluster Plan, Beechwood Lodges 54-63, Phase F
(2051kb)
23-2479-WF-(F)001 - T02
Checkbox input: Select 23-2479-WF-(G)001-T02 Existing Cluster Plan Phase G.pdf for download.
Existing Block/Site Plan
16/03/2026
Existing Cluster Plan, Beechwood Lodges 45-53, Phase G
(2264kb)
23-2479-WF-(G)001 - T02
Checkbox input: Select 23-2479-WF-(H)001-T02 Existing Cluster Plan Phase H.pdf for download.
Existing Block/Site Plan
16/03/2026
Existing Cluster Plan, Beechwood Lodges 36-44, Phase H
(2055kb)
23-2479-WF-(H)001 - T02
Checkbox input: Select 23-2479-WF-(I)001-T02 Existing Cluster Plan Phase I.pdf for download.
Existing Block/Site Plan
16/03/2026
Existing Cluster Plan, Beechwood Lodges 1-7 & 34-35 Phase I
(2072kb)
23-2479-WF-(I)001 - T02
Checkbox input: Select 23-2479-WF-(J)001-T02- Existing Cluster Plan Phase J.pdf for download.
Existing Block/Site Plan
16/03/2026
Existing Cluster Plan, Three Oaks Lodges 66-76, Phase J
(1816kb)
23-2479-WF-(J)001 - T02
Checkbox input: Select 23-2479-WF-(K)001-T02 Existing Cluster Plan Phase K.pdf for download.
Existing Block/Site Plan
16/03/2026
Existing Cluster Plan, Three Oaks Lodges 58-65, Phase K
(1798kb)
23-2479-WF-(K)001 - T02
Checkbox input: Select 23-2479-WF-(L)001-T02 Existing Cluster Plan Phase L.pdf for download.
Existing Block/Site Plan
16/03/2026
Existing Cluster Plan, Three Oaks Lodges 51-57, Phase L
(1293kb)
23-2479-WF-(L)001 - T02
Checkbox input: Select 23-2479-WF-(90)001- Site Plan_LR.pdf for download.
Proposed Block/Site Plan
16/03/2026
Site Plan
(4132kb)
23-2479-WF-(90)001 - T01
Checkbox input: Select 23-2479-WF-(A)002-T02 Proposed Cluster Plan Phase A.pdf for download.
Proposed Block/Site Plan
16/03/2026
Proposed Cluster Plan, Three Oaks Lodges 1-7, Phase A
(2417kb)
23-2479-WF-(A)002 - T02
Checkbox input: Select 23-2479-WF-(B)002-T02 Proposed Cluster Plan Phase B.pdf for download.
Proposed Block/Site Plan
16/03/2026
Proposed Cluster Plan, Three Oaks Lodges 8-19, Phase B
(3777kb)
23-2479-WF-(B)002 - T02
Checkbox input: Select 23-2479-WF-(C)002-T02 Proposed Cluster Plan Phase C.pdf for download.
Proposed Block/Site Plan
16/03/2026
Proposed Cluster Plan, Three Oaks Lodges 20-30, Phase C
(3981kb)
23-2479-WF-(C)002 - T02
Checkbox input: Select 23-2479-WF-(D)002-T02 Proposed Cluster Plan Phase D.pdf for download.
Proposed Block/Site Plan
16/03/2026
Proposed Cluster Plan, Three Oaks Lodges 31-40, Phase D
(4116kb)
23-2479-WF-(D)002 - T02
Checkbox input: Select 23-2479-WF-(E)002-T02 Proposed Cluster Plan Phase E.pdf for download.
Proposed Block/Site Plan
16/03/2026
Proposed Cluster Plan, Beechwood Lodges 64-72, Phase E
(3769kb)
23-2479-WF-(E)002 - T02
Checkbox input: Select 23-2479-WF-(F)002-T02 Proposed Cluster Plan Phase F.pdf for download.
Proposed Block/Site Plan
16/03/2026
Proposed Cluster Plan, Beechwood Lodges 54-63, Phase F
(3737kb)
23-2479-WF-(F)002 - T02
Checkbox input: Select 23-2479-WF-(G)002-T02 Proposed Cluster Plan Phase G.pdf for download.
Proposed Block/Site Plan
16/03/2026
Proposed Cluster Plan, Beechwood Lodges 45-53, Phase G
(3758kb)
23-2479-WF-(G)002 - T02
Checkbox input: Select 23-2479-WF-(H)002-T02 Proposed Cluster Plan Phase H.pdf for download.
Proposed Block/Site Plan
16/03/2026
Proposed Cluster Plan, Beechwood Lodges 36-44, Phase H
(3527kb)
23-2479-WF-(H)002 - T02
Checkbox input: Select 23-2479-WF-(I)002-T02 Proposed Cluster Plan Phase I.pdf for download.
Proposed Block/Site Plan
16/03/2026
Proposed Cluster Plan, Beechwood Lodges 1-7 & 34-35 Phase I
(4293kb)
23-2479-WF-(I)002 - T02
Checkbox input: Select 23-2479-WF-(J)002-T02 Proposed Cluster Plan Phase J.pdf for download.
Proposed Block/Site Plan
16/03/2026
Proposed Cluster Plan, Three Oaks Lodges 66-76, Phase J
(4437kb)
23-2479-WF-(J)002 - T02
Checkbox input: Select 23-2479-WF-(K)002-T02 Proposed Cluster Plan Phase K.pdf for download.
Proposed Block/Site Plan
16/03/2026
Proposed Cluster Plan, Three Oaks Lodges 58-65, Phase K
(3120kb)
23-2479-WF-(K)002 - T02
Checkbox input: Select 23-2479-WF-(L)002-T02 Proposed Cluster Plan Phase L.pdf for download.
Proposed Block/Site Plan
16/03/2026
Proposed Cluster Plan, Three Oaks Lodges 51-57, Phase L
(2449kb)
23-2479-WF-(L)002 - T02
Checkbox input: Select 23-2479-(30)901-V1 - BBQ Plans and Elevations.pdf for download.
Proposed Plan
16/03/2026
BBQ Plans & Elevations
(157kb)
23-2479-(30)901 - V1
Checkbox input: Select 23-2479-(30)902-V1 - BBQ Standard Details.pdf for download.
Proposed Plan
16/03/2026
BBQ, Standard Details
(70kb)
23-2479-(30)902 - V1
Checkbox input: Select 23-2479-(30)905-V2 - Typical Block Paving Bike rack set out.pdf for download.
Proposed Plan
16/03/2026
Typical Block Paving/Bike Rack Set Out
(174kb)
23-2479-(30)905 - V2
Checkbox input: Select 23-2479-(30)950-V1 - Typical Pergola and Patio Set Out Plan Whinfell.pdf for download.
Proposed Plan
16/03/2026
Typical Pergola & Patio Set Out Plan
(201kb)
23-2479-(30)950 - V1
Checkbox input: Select 23-2479-(30)951-V1 - Typical Patio Layout with Retaining Wall Whinfell.pdf for download.
Proposed Plan
16/03/2026
Typical Patio Layout with Retaining Wall
(300kb)
23-2479-(30)951 - V1
Checkbox input: Select 23-2479-WF-(90)002- Location Phase Plan_LR.pdf for download.
Site Location Plan
16/03/2026
Location Phase Plan
(3865kb)
23-2479-WF-(90)002 - T01
Checkbox input: Select 23-2479-WF-(90)003- Site Location Plan.pdf for download.
Site Location Plan
01/04/2026
Site Location Plan
(703kb)
23-2479-WF-(90)003 - P01
Checkbox input: Select 2155-2 - PEA_BNG for Phase 1 of Project Autumn at Whinfell - Report.pdf for download.
Biodiversity Survey/Report
16/03/2026
Preliminary Ecological Appraisal and Biodiversity Net Gain Assessment Redacted
(9859kb)
-
Checkbox input: Select 23-2479 -DAS-P02 Project Autumn Whinfell Phase 1 Design & Access Statement.pdf for download.
Design & Access Statement
31/03/2026
Design & Access Statement
(768kb)
-
Checkbox input: Select The_Statutory_Metric_Macro_Enabled_1.0.4 2155-2(1).xlsx for download.
Metric
16/03/2026
Statutory Metric
(3620kb)
-
Checkbox input: Select Morvelle Center Parcs Proposal (11-12-24)(2).pdf for download.
Supporting Documentation
16/03/2026
Morvelle Proposal
(2523kb)
-
Checkbox input: Select 2132 - CP - WF - Autumn P1 - Arboricultural Impact Assessment - February 2026 (Revision A March 2026).pdf for download.
Tree Survey
16/03/2026
Arboricultural Impact Assessment
(1863kb)
-
Checkbox input: Select 2132 - CP - WF - Autumn P1 - Arboricultural Method Statement - February 2026 (Revision A March 2026).pdf for download.
Tree Survey
16/03/2026
Arboricultural Method Statement
(2251kb)
-
The consultation date has passed. Any comments made now may not be considered